News

  • New Technical Director

    DASAG GmbH Verfahrenstechnik - Anlagenbau has appointed Andreas Müller as new technical director. The qualified engineer has been part of the team...

    Read more
  • Silo for power plant

    We successfully delivered the first of two 100 m³ silos with a diameter of 3,700 mm. The heavy load transport with a length of 20.2 m and a weight of...

    Read more