DASAG GmbH Verfahrenstechnik - Anlagenbau has appointed Andreas Müller as new technical director. The qualified engineer has been part of the team...
We successfully delivered the first of two 100 m³ silos with a diameter of 3,700 mm. The heavy load transport with a length of 20.2 m and a weight of...
Anlage zur Förderung von Farbpigmenten aus Lagersilos in Verarbeitungsanlagen
Kunde:
Schüttgut:
Prozessparameter:
Anlagenspezifikation:
Realisierung: